1. 
        
        <noscript id="2i3ws"><dl id="2i3ws"></dl></noscript>
          <rp id="2i3ws"><dl id="2i3ws"></dl></rp>
          <i id="2i3ws"></i>
        1. <td id="2i3ws"></td>
          <td id="2i3ws"><ins id="2i3ws"><label id="2i3ws"></label></ins></td>

              av一区二区三区在线观看_久久99精品国产自在现线_日日碰狠狠躁久久躁_东京热一区_来一水AV@lysav

              Welcome to Shenzhen Zhongyuan Plastic Co., Ltd!

              News



              Tel:(0755)27151698
              Fax:(0755)27150611
              Mailbox:szzyzcl@163.com / szzy@szzy99.com
              Add:Building A1 and A2, No.1 Industrial Zone, yuliu property company, Gongming town, Bao'an District, Shenzhen
              Industry information

              當(dāng)前位置:

              首頁 News Industry information

              Plastic mold injection molding process

              Release time:2024-03-27

              Plastic moldInjection moldingThe whole process of molding includes feeding, plasticizing, mold filling, pressure maintaining, backflow, cooling and demoulding.


              (1) Feeding

              In the process of plastic mold injection molding, granular or powdered plastic needs to be added to the hopper of the injection machine, and then brought into the barrel by the plunger or screw for heating.


              (2) Plasticization

              The process of granular or powdery plastic heating and melting in the barrel in a flowing state is called plasticization.


              (3) Mold filling

              The molten plastic melt is pushed by the plunger or screw of the injection machine, enters the cavity of the plastic mold through the nozzle and gating system of the mold at a certain pressure and speed, and fills the cavity after a certain time. This stage is the mold filling stage in the plastic mold injection molding process.


              (4) Pressure maintaining

              After filling, under the push of the plunger or screw of the injection machine, the melt still maintains a certain pressure, so that the molten plastic in the barrel continues to enter the cavity, which is used to supplement the shrinkage of the plastic in the cavity of the plastic mold, so as to increase the density of the plastic parts and reduce the shrinkage of the products and the surface defects of the products. This stage is the stage of maintaining pressure in plastic mold injection molding.


              (5) Backflow

              After the pressure maintaining is completed, the plunger or screw of the injection molding machine will retract, which will release the pressure of molten plastic in the plastic mold cavity. At this time, the pressure of molten material in the cavity will be higher than that in front of the gate. If the gate has not condensed at this time, the molten material in the cavity will flow back to the pouring system of the mold through the gate, causing defects such as shrinkage, deformation and loose texture of the product. This phenomenon is called backflow. If the gate has condensed when the injection pressure is removed, there will be no backflow. Therefore, we can see whether backflow will occur and the degree of backflow is directly related to the holding time. Generally, if the pressure holding time is too long, the probability of backflow will be smaller.


              (6) Cooling

              The cooling process of plastic parts in the plastic mold refers to the whole process from the plastic melt at the gate to the plastic parts being pushed out of the mold cavity. At this time, stop feeding or backflow, and the plastic in the mold cavity continues to cool and set.


              (7) Demoulding

              When the product is cooled to a certain temperature and has sufficient strength to prevent warpage and deformation, the mold can be opened, and then the plastic part can be pushed out of the mold under the action of the ejector mechanism. This stage is the demoulding stage in plastic mold injection molding.

              2.jpg

              Copyright: Shenzhen Zhongyuan Plastic Co., Ltd. | mold processing customized manufacturer. If you want to know the processing price of the factory, how much is it, and which is good, please contact us Yue ICP Bei No. 17060480
              av一区二区三区在线观看_久久99精品国产自在现线_日日碰狠狠躁久久躁_东京热一区_来一水AV@lysav

                1. 
                  
                  <noscript id="2i3ws"><dl id="2i3ws"></dl></noscript>
                    <rp id="2i3ws"><dl id="2i3ws"></dl></rp>
                    <i id="2i3ws"></i>
                  1. <td id="2i3ws"></td>
                    <td id="2i3ws"><ins id="2i3ws"><label id="2i3ws"></label></ins></td>

                        多伦县| 宜阳县| 通州市| 衢州市| 乐业县| 中阳县| 德安县| 定远县| 健康| 五华县| 泉州市| 锦州市| 元谋县| 林口县| 泗水县| 罗平县| 久治县| 许昌县| 舞阳县| 嘉兴市| 德州市| 云阳县| 彭州市| 呼和浩特市| 竹山县| 花莲县| 凉山| 石门县| 中宁县| 琼结县| 新平| 永川市| 新兴县| 营山县| 木兰县| 八宿县| 建昌县| 靖安县| 大同市| 大兴区| 佛冈县|